St. Johns County School HH

This 153,000 SF project was awarded to Flagship along with School II. The projects were constructed simultaneous and completed on schedule.  The concrete work associated with the project included:

  • 800 CYDS of Foundations

  • 153,000 SF of 4”, 5” 6” and 8” Slab-On-Grade

  • 44,800 SF of Slab-On-Metal-Deck

  • 5 ½”, 7 ¼”, 8” and 9 ¼” thick 2 story tilt-wall panels with form-liner

  • 50,770 SF of 4” Walkways

  • 4,410 SF of 4” Basketball Court

  • 4,553 SF of 4” Bike Rack slabs

  • 1,240 SF of 6” Chiller Yard Pump Room slab

  • 3,540 SF of 8” Chiller Yard Ice Storage Room

  • 3,456 SF of 5” & 449 SF of 4" Pavilion slab

  • 292 SF of 6” Generator slab

  • (91) 2’ x 2’ x 2’ Canopy sidewalk footings

  • 65 LF of site CMU wall footing

  •  8” & 12" CIP canopies

  • 10” & 16" CIP columns

  • CIP Piers

  • Marquee Signs

  • Elevator Pits

  • Pipe Bollards